Every sign in a national program has to be approved by the local jurisdiction, and often by a landlord as well. For brands with locations in many cities, permitting is usually the part of a sign project that takes the longest and causes the most delays. Knowing what to expect makes it much easier to plan around.
Why sign permits matter
Cities regulate signs to manage safety, traffic visibility, and the look of their communities. Installing a sign without a permit can lead to fines, forced removal, and delays on future approvals at that location. A properly permitted sign protects your investment and your relationship with the community.
What sign codes usually regulate
- Size: the total sign area allowed, often based on the length of the building frontage.
- Height: limits on how tall freestanding signs can be and how high wall signs can be mounted.
- Setbacks: how far signs must sit from property lines and roads.
- Number of signs: how many wall, freestanding, and directional signs each site can have.
- Illumination: whether signs can be lit, how bright they can be, and when they must turn off.
- Electrical and structural requirements: engineering and electrical permits for lit and freestanding signs.
Landlord sign criteria
Shopping centers and managed properties often publish their own sign criteria, which can be stricter than city code. Criteria may limit colors, letter heights, lighting types, and mounting methods. In most cases the landlord has to approve the design before the city will issue a permit, so landlord review belongs early in the schedule.
What a permit package includes
A typical package includes a site plan, building elevations showing sign placement, sign drawings with dimensions and materials, engineering for freestanding or heavy signs, electrical details for lit signs, and the application and fees. Accurate site surveys make this package faster to prepare and less likely to come back with comments.
How long permits take
Review times vary widely by jurisdiction. Some cities approve simple wall signs quickly, while others require multiple reviews or board approvals. The best way to protect a rollout schedule is to start permitting as early as possible, track every application, and respond to comments right away.
When your standard sign is not allowed
National brand standards do not always fit local code. In those cases there are two paths. The first is an approved variation, such as smaller letters, a different layout, or a non-illuminated version, designed in advance as part of your sign family. The second is a variance, a formal request to allow a sign that does not meet code. Variances can take time and usually involve a public hearing, so they work best for high-priority locations.
At Hilton Displays, we have worked through site-specific zoning requirements and participated in variance meetings for Starbucks, adapting designs so the brand’s vision works within what each jurisdiction allows.
Temporary signs, covers, and banners
Temporary signage often needs its own approval. During the Truist conversion, our team installed new permanent signs and covered them with legacy branding until the unveiling, which meant permitting both presentations. Planning for temporary signs up front avoids last-minute surprises.
A permitting checklist for national programs
- Survey every site before preparing drawings.
- Collect landlord sign criteria for every managed property.
- Design a family of approved variations before permitting starts.
- Submit permits as early as possible and track every application.
- Plan for variances only where they are truly worth the time.
- Confirm all approvals before installation day.